Posted at March 25, 2009 @ 1:26 pm by Dillon in home improvement, life, opinions, work
Well I got a job to start tomorrow. Someone called me wanting a wall torn out and replaces with an archway going from their dining room to their living room. They really wanted the whole wall taken out if possible but it is a weight baring wall and wasn’t possible. So I told them that I could take most of the wall out in the middle, put an archway in it and leave about a quarter of the wall on each side of the archway. They were happy with that.
I’ve got all of the materials since they called on Friday and I was able to price the job and check it out before I had to go to my part time job. That new job is going to take a couple of days to complete and I think they’re going to want flooring too once I finish the wall. They are just about going to have to have more flooring because of removing part of the wall. It might turn into a pretty good job for me in the end. I sure hope it does anyway.